1. Pre-Possession and Civil Handover Snagging
Before taking official keys from your builder, conduct a thorough handover inspection with a spirit level and hollow-tile tap hammer. Ensure all bathroom slopes drain freely, window frames are weather-sealed, and main door jambs are plumb.
- Inspect wall plumbness and corner squareness using a 90-degree framing square.
- Check tile adhesion by tapping floor and bathroom wall tiles for hollow sounds.
- Test all electrical conduits and MCB breakers for proper earthing and phase balance.
- Verify water supply pressure and drain line flow in kitchen sink and utility areas.
- Obtain society interior work guidelines, gate pass formalities, and working hour rules.