1. The 7 Defensive Rules for Homeowners
1. Insist on a Detailed Written Scope: Verify that electrical wiring shifts, core cutting, wall putty, primer coats, and deep cleaning are explicitly documented.
2. Verify Material Substrate Brand Names: Ensure the contract states 'Century/Greenply BWP Marine IS:710 16mm' rather than simply 'commercial waterproof plywood'.
3. Specify Hardware Model Numbers: Request specific product lines (e.g. Hettich Sensys soft-close 110-degree hinges) to prevent lower-grade substitutions.
4. Conduct As-Built Laser Measurements: Ensure all cabinetry is designed to actual room dimensions, not builder sales brochures.
5. Freeze Ceiling and Lighting Layouts Early: Relocating a false ceiling light point after gypsum boards are taped and painted creates unnecessary repair costs.
6. Establish a Formal Change Order Protocol: Any mid-project design alteration should require a written scope revision signed by both parties before work proceeds.
7. Reserve 5% Final Retention for Snagging: Retain a final token balance until all punch-list items, paint touch-ups, and hardware alignments are inspected and approved.